5 Steps of the FM Approvals Certification Process
No matter the product or the complexity of the test program, we will work with you to evaluate your product against the highest level of testing standards to earn the FM APPROVED mark. The Approval process is efficient and helps differentiate your product in the marketplace.
STEP 1
Manufacturer Request
The manufacturer submits a letter, fax or email to FM Approvals, requesting Approval for a product or assembly and provides the location, scope of work, model numbers, specifications and applicable sales literature. Customers seeking Approval of new products should fill out our application form to request a quote.
STEP 2
Proposal Issue and Manufacturer Authorization
FM Approvals sends a proposal letter to the customer with the scope of work, cost estimates, schedule, required tests and sample needs. For new customers, a one-time contractual agreement is also mailed for signature (Master Agreement). The manufacturer then authorizes the proposal in writing and submits all requested material and information identified in the proposal.
STEP 3
Review, Testing and First Audit
FM Approvals makes drawing or specification to product comparisons. If all necessary items are received, testing is scheduled and conducted. The investigator visits the customer’s facility (if first-time customer or new manufacturing location) to review quality control procedures prior to product Approval by FM Approvals.
STEP 4
Report, FM APPROVED Mark and Listing
Once testing has been completed successfully, a report is prepared and reviewed for technical accuracy and quality. Samples are retained and archived as necessary, returned to the customer or disposed of per the customer’s instructions. FM Approvals sends the final report to the manufacturer. Approval is effective as of the date of report. The manufacturer may then label the product as FM Approved, and the product is listed in the Approval Guide, an online resource of FM Approvals. FM Approved roofing assemblies are entered into RoofNav, our web-based software.
STEP 5
Surveillance Audits
Surveillance audits of manufacturing facilities are required in order to maintain FM Approved status.
Free Sample Report Performance Quality Control
Download a sample report to keep control of your supply chain!
Featured Articles
- AQL Table | How to Read It
- TOP 10 Common Defects in Garments Quality Inspection
- Product Packaging and Shipment Label requirements for Amazon FBA
- What Is ASTM-F2413-18? Protective Footwear Standard
- How to Conduct Third-Party Quality Control Inspections for Electric Scooters
- SMETA Audit-What is SMETA Audit?
- TESTCOO Supplier Verification/Certification Service SLCP, Higg FEM, GRS, GOTS
- Quality Control Inspection Company in China
- What is Quality Inspection? A Complete Guide
- Guidelines for Product Inspection in India
Category
- Production Inspection Service
- Factory Audit
- Softline Inspection
- Hardline Inspection
- Electrics Inspection
- Certification
- Checklist
- Manufacturers
- Quality Assurance Basics
- Products Recall
- AQL
- Guidence and Standard
- News
- Supplier Management
- Amazon
- Protective Equipment
- e-commerce quality control
- Indian Manufacturing
- Soft Goods Quality Control
- Supply Chain Management
- Supply Chain Resilience
- E-Commerce Quality Control
- ISO 2859
- Supply Chain Optimization
- Garment Industry
- Higg Index